摘要
松花江三姓浅滩是松花江碍航严重区段 ,通过对该江段自然条件详细分析掌握全面资料基础上 ,精心设计 ,周密的施工准备 ,通过爆破清渣实验 ,定出具体施工方案 ,使三姓浅滩二期整治工程取得较好效果。
Songhuajiang River Sanxing Shoal was the section of Songhuajiang River seriously obstructing navigation. Based on detailed analysis of the natural conditions and with a grasp of the overall data of Sanxing Shoal section to carry out meticulous design and careful construction preparation and through blasting clearing test to work out concrete construction scheme, Sanxing Shoal Phase II Regulation Project achieved a good effect.
出处
《水运工程》
北大核心
2002年第11期63-66,共4页
Port & Waterway Engineering