摘要
简要介绍了CPR1000核电新项目地震仪表系统设计优化方案,并将优化方案与岭澳二期的方案进行了对比,重点分析优化方案如何在满足法规、标准要求的同时,完善地震仪表系统的安全评价分析信息测点功能。
This paper introduces the design optimization program for the seismic instrumentation system of new CPR1000 nuclear power projects and compares it with Ling'ao Phase Ⅱ.This paper focuses on analyzing how the optimization program meets the regulations and standards and improves the measuring point function for seismic safety evaluation of instrumentation systems at the same time.
出处
《核科学与工程》
CSCD
北大核心
2010年第S1期128-131,共4页
Nuclear Science and Engineering
关键词
CPR1000核电厂
地震仪表系统
CPR1000 nuclear power plant
seismic instrumentation system