期刊文献+

关于海上起重铺管船关键技术与自主创新的几点建议

下载PDF
导出
摘要 3000吨海上起重铺管船是我国自主研制的具有世界先进水平的铺管工程船。对我国的海洋开发具有重要的意义。以3000吨级海上铺管起重船为代表,介绍了我国在海洋工程领域的发展历程,阐述了我国在海洋工程装备领域取得的关键技术与自主创新成果。以期对未来我国海工装备制造技术的发展提供参考与启示。 The 3000 tons offshore pipe-laying crane vessel is ourself-developed project pipelay vessel with the world advanced level. And it has the vital significance to the marine exploitation in China. Taking the 3000 tons offshore pipe-laying crane vessel as an ex-ample, this paper introduced the development process in the field of marine engineering in China and described the key technology and independent innovation achievements we have made, which would provide reference and inspiration for the future development of marine equipment manufacturing of our country technology.
出处 《黑龙江科技信息》 2015年第7期5-,共1页 Heilongjiang Science and Technology Information
基金 国家自然科学基金资助项目(11272160) 浙江省自然科学基金资助项目(LY13A020006) 国家高技术研究发展计划(863计划)(2014AA09A224)
关键词 起重铺管船 海洋工程 关键技术 自主创新 Pipe-laying crane vessel Ocean engineering Key technology Independent innovation
  • 相关文献

参考文献4

二级参考文献16

  • 1William L Leffler, Richard Pattarozzi, Gordon Sterling. Deepwater Petroleum Exploration & Production[R]. USA, PennWell Corporation, 2003.
  • 2Yong Bai, Qiang Bai. Subsea Pipelines and Risers[R]. Great Britain, Elsevier Ltd, 2005.
  • 3Ben C Gerwick Jr. Construction of Marine and Offshore Structures[M]. USA, CRC Press, 2007.
  • 4sChristopher West, Stephen Armstrong, Damon MeMillan, et al. S-lay installation of riser fairings for the independence hub[C]//Proceedings of the International Conference on Offshore Mech~ics and Arctic Engineering. 2007(1):515-525.
  • 5Heedo D Yun, Ralf R Peek, Paul R Paslay, et al. Loading history effects for deep-water S-lay of pipelines[J]. Journal of Offshotve Mechanics and Arctic Engineering, 2004, 126(2): 156-163.
  • 6Massimo Pulici, Marian Trifon, Andrei Dumitrescu. Deep water salines installation by using the J-lay method-The blue stream experience[ C] //Proceedings of the International Offshore and Polar Engineering Conference, ISOPE. 2003:585-590.
  • 7Dick Wolbers, Rob Hovinga. Installation of deepwater pipelines with sled assemblies using the new J-lay system of the DCV balder[J]. Journal of Offshore Technology, 2003, 11 (3) : 46-57.
  • 8T A Netto, A Botto, M I Lourenco, et all. On the feasibility of installing SCR's by the reel-lay method[ C ]//' Proceedings of the 12th In- ternational Congress of the International Maritime Association of the Mediterranean. 2005(2):1447-1454.
  • 9Alastair Tawns. Reel-laying of rigid pipelines[J]. Materials Performance, 2004, 43( 10): 24-26.
  • 10llson P Pasqualino, Segen F Estefen, Silvia L Suva. The effect of the reeling laying method on the collapse pressure of steel pipes for deepwater[C]//Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering, ASME. 2004(3):247- 254.

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部