3LEONARDO R, FRANK C F. Measuring the impact of Lean tools on the cost - time investment of a product using cost - time profiles [ J ]. Robotics and Computer - integrated Manufacturing, 2007 ( 23 ) : 684 - 689.
4SAN JAY B. Lean and performance measurement [ J ]. Journal of Manufacturing Technology Management, 2008,19(5) :670 -684.
5ANAND G, RAMBABU L. Selection of lean manufac- turing systems using the analytic network process: a case study [ J ]. Journal of Manufacturing Technology Management, 2009,20 ( 2 ) : 258 - 289.
6CHRISTIAN H, CUNEYT E, ADRIANA R H. The effect of lean production on financial performance: the mediating role of inventory leanness [ J ]. Int J Production Economics, 2012,138 ( 2 ) : 242 - 253.
7VIMAL K E K, SEKAR V. Application of artificial neural network for fuzzy logic based leanness assess- ment[ J]. Journal of Manufacturing Technology Man- agement, 2013,24 (2) :274 - 292.
8JOACHIM M, JORG B, STEFAN S, et al. Volume and mix flexibility evaluation of lean production sys- tems[C]/// 2013 2^nd CIRP Global Web Conference. [S. 1. ]:[s.n. ],2013:79 -84.