期刊文献+

机械设备安装找正找平的研究

下载PDF
导出
摘要 设备安装的找正找平工作,概括起来主要是进行点位查找,即中心点、测量点、标高位和水平位。是保证设备运行达到技术要求规定的质量标准,保持设备的稳定及其重心的平衡,目的是避免设备变形减少运行中的振动,对设备工作精度,工作质量和效率有着重要的影响。 The search for the equipment installation is to find the flat work, which is mainly to carry out the spot search,that is, the center point, the measurement point, the bid height and the horizontal position. It is to ensure that the operation of the equipment meets the quality standards stipulated by the technical requirements and maintains the stability of the equipment and its center of gravity. The purpose is to avoid the deformation of the equipment and reduce the vibration in the operation. It has an important impact on the accuracy, quality and efficiency of the equipment.
机构地区 漯河技师学院
出处 《科学技术创新》 2018年第32期182-183,共2页 Scientific and Technological Innovation
关键词 找正找平 测量基准面 测点 水平仪 Looking for leveling Measurement datum Measuring point Level
  • 相关文献

参考文献2

二级参考文献1

  • 1杨文柱.设备安装工艺[M].北京:中国建筑工业出版社,1989.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部