摘要
介绍了某发电厂厂址P =1%洪水位的推求 ,并结合厂址具体情况 ,进行几种防洪措施的技术经济比较。
This article introduces the calculation of 1% frequency high water level of a certain power plant area. According to the detail of the power plant area, several flood prevention measure are compared in respect of economy and technology.
出处
《山东电力技术》
2003年第1期45-47,共3页
Shandong Electric Power
关键词
发电厂
厂址
防洪措施
优化分析
Power plant Flood control measures Optimizing analysis