传统的接地网施工控制方法具有工作量大、易出现统计错误、不利于工作交接等缺点。本文提出利用计算机手段改进接地网施工控制的方法,能优化接地网施工控制过程,提高经济效益。并建立了特高压换流站接地网施工控制软件模型。
The grounding grid covers a big area and has many connection points in a UHVDC converter station. It's difficult to control the quality of the construction and measure the points. The traditional methods of construction control have such shortcomings as heavy workload,prone to statistical errors,and not conducive to work handover. This paper proposes to use computer as a tool to improve the method of construction control of grounding grid,and establish a software model of'Construction Control of Grounding Grid in UHVDC Converter Station '.