5KamranS. Moghaddam,JohnS. Usher.A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems[J].Engineering Optimization.2011(7)
5Bris R,Chatelet E. New Method to Minimize the Preventive Maintenance Cost of Series-parallel Systems [J]. Reliability Engineering & System Safety,2003,82(3):247-255.
6Vaurio J K. Availability and Cost Functions for Periodically Inspected Preventively Maintained Units [J]. Reliab Engng Syst Safety, 1999,63(2) : 133-140.
7Jeffery K C, Horng S M, John W F. A Multipopulation Genetic Algorithm to Solve Multiobjective Scheduling Problems for Parallel Machines[J]. Computers & Operations Research, 2003,30 (7) : 1087-1102.