6[2]张民庆,韩占波,孙国庆,等.圆梁山隧道PDK354+255~PDK354+275溶洞段施工技术[J].铁道工程学报,2002,(4):71-78.(Zhang Minqing,Han Zhanbo,Sun Guoqing,et al.Construction technology of cavity section PDK354+255~PDK354+275 in parallel heading at intake portal of Yuanliangshan Tunnel[J].Journal of Railway Engineering Society,2002,(4):71-78.(in Chinese))
7[5]张民庆.饱和含水砂层施工技术[A].见:第十届隧道年会论文集[C].[s.l.]:[s.n.],1998.543-547.(Zhang Minqing.Engineering technique of saturation and containing water sand[A].In:Proceedings of the 10th Tunnel Academic Conference Symposium[C].[s.l.]:[s.n.],1998.543-547.(in Chinese))