工程造价管理改革与控制方法浅论 被引量:21

Project Cost Management Reform and Control Methodology
下载PDF
导出
摘要 当前工程造价管理体制中所存在的问题主要是:造价管理条块分割,政出多门,协调配合乏力;工程造价计价模式不适应市场经济的需要;工程建设项目造价全过程综合管理的意识薄弱。改革造价管理方法,应通过改革管理体制、转变指导思想、强化全过程管理意识等方面着手,工程造价方法应在精确编制标底预算、抓好甲供设备及材料投资管理、严格办理设计变更签证等方面努力。 The existing major problems in current project cost management system are: cost management fragmentation with weak coordination;project cost pricing models are not suited to the needs of market economy;and weak awareness on the comprehensive management of the entire project cost process.To reform cost management,we should start from reforming management system,changing guiding ideology,strengthening entire process management awareness,and make efforts on project cost method of bidding price accuratly,grasping equipment provided by the first party and the invest management of material,as well as strict design changes.
作者 张皇兵
出处 《湖南民族职业学院学报》 2008年第1期28-31,共4页 Hunan Vocational College for Nationalities
关键词 工程造价 管理 改革 控制方法 Project Cost Management Reform Control Method
  • 相关文献

同被引文献43

引证文献21

二级引证文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部