对多目标水电项目在采用可分离费用剩余效益法进行投资分摊的基础上 ,运用群决策理论建立了多目标水电项目的投资分摊模型 ,并利用最优化理论 ,提出了几种投资分摊方法的最优组合模型 。
Based on the separable cost_remaining benefit method for multi_objective hydropower projects, an investment distribution model is established applying group decision theory; and an optimal combination model of several investment distribution methods is put forward by using the optimization theory. The example shows the justice and efficiency of this method.
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2002年第6期28-31,共4页
Engineering Journal of Wuhan University
关键词
投资分摊
水电项目
最优组合
SCRB法
investment distribution
hydropower projects
optimal combination