三峡二期工程拌和系统制冷系统安装监理 被引量:1

Installation supervision on cooling system at mixing plant of TGP's stage Ⅱ works
下载PDF
导出
摘要 三峡二期工程混凝土浇筑工程量大、强度高 ,混凝土自然温升快 ,升幅大。若不采取人工降温措施 ,混凝土将极易产生裂缝。 5~ 1 0月混凝土浇筑强度一般为 480m3 h ,为确保高温季节混凝土施工质量 ,在制冷系统安装过程中 ,监理人员编制严格质量控制计划、明确质量控制点 ;加强对安装全过程质量控制 ,针对制冷系统安装的施工特点 ,做到层层把关。通过采取这些措施 。 The concrete placement of TGP stage Ⅱ works characterized as large quantity, high construction intensity, fast and large range of concrete temperature rise. If no artificial cooling measures were taken, the concrete would be vulnerable to crack. The concrete placement intensity from May to October is generally 480 m\+3/h. In order to guarantee concrete construction quality in high temperature season, in the installation process of cooling system, the supervisors made out strict quality control plan and defined quality control points, strengthened quality control in the whole installation process and carried out control in every construction link in the light of cooling system installation. By these measures, the concrete construction quality was guaranteed.
作者 王祖江
出处 《人民长江》 北大核心 2002年第12期3-4,共2页 Yangtze River
关键词 拌和系统 安装 冷却系统 施工监理 三峡水利枢纽 混凝土 concrete mixing cooling system construction supervision TGP
  • 相关文献

同被引文献3

  • 1中国电建集团成都勘测设计研究院有限公司.重庆市嘉陵江航运开发草街航电枢纽船闸工程工程初步设计[R].2004.
  • 2水利电力部水电建设总局.水利水电工程施工组织设计手册[M].北京:中国水利水电出版社,1990.
  • 3曹文.桐子壕航电工程施工综述[J].四川水力发电,2002,21(3):13-17. 被引量:1

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部