摘要
结合某工程实例 ,分析了施工阶段泵送混凝土越冬裂缝的成因 ,从结构设计和施工中减少温度应力两方面提出了预控方法 ,收到了良好的防裂效果。
Combined with engineering the causes of pump concrete cracks in construction stage are analyzed. And from structure design and reducing temperature stress some controlling measures are proposed, which acquire good prevention effects in application.
出处
《山西建筑》
2002年第12期56-57,共2页
Shanxi Architecture
关键词
泵送混凝土
裂缝
冬期施工
pump concrete, crack, winter construction