摘要
介绍石嘴山电厂(4×300MW)扩建工程汽机房预应力吊车梁施工中,Φ32Ⅳ级钢预应力高强精轧罗 纹钢筋的应用、JLM冷挤压锚具的应用,张拉技术及施工过程的质量控制.
The paper introduces the application of Grade IV pre-stressed steel bar, 432 high-strength finishing screw-threaded steel, JLM cold-extruded anchorage devices, and the quality control in the post-tensioned technique and construction process.