摘要
本文对部分预应力多层现浇钢筋混凝土框架结构施工过程进行分析,包括:垂直和水平运输工具的选择、模板工程、钢筋工程、混凝土工程、预应力钢筋的张拉和锚固的施工工艺和质量控制方法。
In the process of partially pre-stressed multi- layer cast-in-place reinforced concrete frame structure construction, which includes choice of vertical and horizontal transport vehicles, template works, works of reinforced concrete frames, the pre-stressed steel tension , anchor construction technology and quality control methods.
出处
《河套学院论坛》
2007年第4期70-72,79,共4页
HETAO COLLEGE FORUM
关键词
预应力
框架
施工
质量
pre-stress
framework, construction, quality