摘要
分析首台国产快锅负荷控制系统长期不能正常工作的原因 ,利用原有软硬件资源进行功能开发 ,综合改造 。
Analyzes reasons for long term irregular operation of the load control system of the first domestic fast boiler.Uses original software and hardware to develop the function and improve the system,so as to realize the fast boiler′s automatic tracking of MP steam pipe loading in ammonia plant.
出处
《大氮肥》
CAS
2002年第6期395-398,共4页
Large Scale Nitrogenous Fertilizer Industry