阐述在装置实施技术改造中 ,充分利用原有外管架 ,并经过优化设计改造后 ,既满足了工艺要求 ,又节约了用地 。
During the technical modification the existing pipe-rack is fully utilized and after the optimized design it can not only meet the process requirements but also save the land occupation and investment.
出处
《化工设计》
CAS
2002年第6期46-48,共3页
Chemical Engineering Design