期刊文献+

我国发电侧电力市场中AGC机组的调配框架 被引量:22

FRAMEWORK OF AGC UNIT SELECTION ON THE GENERATION-SIDED ELECTRICITY MARKET
下载PDF
导出
摘要 对现阶段我国电力市场中自动发电控制 (AGC)机组调配问题进行了研究。结合辽宁省电力市场的运行情况 ,给出了相应的数学模型 ,并对该模型中的两个基本要素 AGC容量和所需调节速率的确定问题进行了剖析 ,明确了直接利用计划数据无法准确求得上述两个量的结论。指出考察历史数据来获取系统中所需 AGC调节容量和速率是一个有效的途径。实际系统的算例表明 。 The problem of selecting which generating unit to perform AGC function is addressed here. In accordance with the structure of Liaoning Electricity Market, the mathematical model is proposed to select the generating unit to perform AGC function in order to minimize the AGC service cost. Theory analysis shows that it is not feasible to determine the capacity and the regulating speed of AGC service using planning data. The idea to determine the two parameters above by historical data is proposed. The application to a real system shows that the method presented are feasible.
出处 《电力系统自动化》 EI CSCD 北大核心 2003年第2期37-40,51,共5页 Automation of Electric Power Systems
关键词 发电侧电力市场 AGC 自动发电控制 机组调配 电力系统 能量管理系统 电力工业 Data acquisition Electric load forecasting Energy management Mathematical models
  • 相关文献

参考文献3

  • 1[2]Jaleeli Nasser, Vanslyck L S, Ewart Donald, et al. Understanding Automatic Generation Control. IEEE Trans on Power Systems, 1992, 7(3): 1106~1122
  • 2[4]Rau Narayan S. Optimal Dispatch of a System Based on Offers and Bids-- A Mixed Integer LP Formulation. IEEE Trans on Power Systems, 1999, 14(1): 274~279
  • 3[5]Singh Harry, Papalexopoulos Alex. Competitive Procurement of Ancillary Services by an Independent System Operator. IEEE Trans on Power Systems, 1999, 14(2): 498~504

同被引文献189

引证文献22

二级引证文献148

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部