列车荷载对长江沉管隧道的影响 被引量:22

Effects of train loads on immersed tunnel in Yangtze River
下载PDF
导出
摘要 拟定中的京沪高速铁路南京长江沉管隧道,设计中需确定列车荷载的影响。本文根据弹性地基梁原理,采用计算各截面的影响线方法,按最不利情况加载,得到了最大的反应值(沉陷,剪力和弯矩),并采用三维有限元拟静力方式,对沉管隧道接头受力状态进行分析计算,计算结果为长江沉管隧道的初步设计提供了参考依据。 It is necessary for design to define the effects of train loads on Nanjing Yangtze River immersed tubular tunnel which is planning in the high speed railway line from Beijing to Shanghai. In this paper, According to the infection line method, the maximal values (sefflement, shear and moment) of the tunnel are calculated by using the theory of beams on elastic foundation. Then, the stress state on adapter between two immersed tubes is calculated based on 3-D finite element method. The numerical results provide references for preliminary design of the tunnel.
出处 《铁道学报》 EI CSCD 北大核心 2001年第3期117-120,共4页 Journal of the China Railway Society
关键词 接头 弹性地基梁 影响线 有限元 列车荷载 长江沉管隧道 影响 immersed tubular tunnel adapter beams on elastic foundation infection line finite element
  • 相关文献

参考文献4

  • 1武晓军,南京长江沉管隧道接头设计研究,1998年
  • 2京沪高速铁路线、桥、隧、站初步设计暂行规定,1997年
  • 3潘昌实,隧道力学数值方法,1995年,63页
  • 4龙驭球,弹性地基梁的计算,1981年,15页

同被引文献160

引证文献22

二级引证文献237

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部