摘要
结合赤湾港近20年来所建大型钢筋混凝土桩基码头,根据实际观测、调查及国内外近期科研成果,对已建和待建的桩基码头的耐久性问题,提出建议措施。
In combination with the large-scale reinforced concrete piled wharf constructed during the past 20 years in Chiwan Port and according to the results of real survey, investigation and scientific research both in China and abroad, suggestions on durability of piled wharf already built and to be built are put forward.
出处
《水运工程》
北大核心
2002年第12期23-26,共4页
Port & Waterway Engineering