摘要
提出了一种优化Mesh结构电源 地布线网的快速算法,使电源 地线网在可靠性约束条件下,通过调整线段的长度和宽度,布线面积达到最小。其基本思想是将约束条件下的非线性规划问题转化为线性规划问题,得到所需的线段长度和宽度。
Presents a fast algorithm to optimize Meshbased power/ground networks so that the area required by the routes is minimized subject to the reliability constraints by changing the widths and lengths of the wires. The basic idea is to transform the constrained nonlinear programming problem into a sequence of linear programs and get the widths and lengths of the wires.
出处
《计算机与现代化》
2003年第1期1-2,5,共3页
Computer and Modernization