杭州大剧院主舞台考虑线拉施工方案的计算分析 被引量:3

Analysis of Structural Performance in Hangzhou Grand Theater Considering the Construction Process
下载PDF
导出
摘要 杭州大剧院采用大跨预应力混凝土框架结构。本文主要对该剧院主舞台中的多层预应力混凝土框架进行了考虑张拉施工方案的计算分析。结果表明 ,现行设计法所得的预应力综合弯矩和预应力次弯矩与实际值有较大的偏离。本文以保证按逐层法施工时现行设计法能满足框架控制截面的抗裂和承载能力要求 ,提出了修正方法。 Construction process of multi story prestressed concrete frames (MPCF) should be noted in structural analysis because the sequence of steel tension and concrete pouring directly affects on building mechanical model. But in general it is not considered during designing of MPCF. The calculated model of the main platform in the Hangzhou Grand Theater is analyzed considering the construction process. The key site is reinforced in order to satisfy the requirement of cracking capacity and bearing capacity of the prestressed frame.
出处 《结构工程师》 2002年第4期34-39,共6页 Structural Engineers
关键词 剧院 舞台 线拉施工 预应力混凝土 框架 prestressed concrete, frame, construction technique
  • 相关文献

参考文献1

  • 1邬喆华.考虑施工因素对预应力混凝土框架结构性能的影响.哈尔滨:哈尔滨建筑大学,1995

共引文献1

同被引文献10

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部