结合鄱阳湖区二期防洪工程乐丰联圩除险加固工程乐波5标堤身防渗施工,阐述了多头小直径深层搅拌桩的工作原理、施工工艺、技术要求和质量控制.
Combined with the antiseepage construction of Lefeng dyke of the 2th stage floodcontrol engineering in the Poyang Lake,this paper stated the running principle,construction technology and the quality control techonology of the rnultidrills smalldiameter deeplayer miningpile.
出处
《江西水利科技》
2002年第B12期51-53,共3页
Jiangxi Hydraulic Science & Technology