溶、土洞地质条件下采用两种桩基施工应用研究 被引量:3

Application Study of Two Pile Foundations Adopted under the Geologic Condition of Solution Cavity and Soil Cavity
下载PDF
导出
摘要 简述广州新白云国际机场货运站区岩土工程采用静压管桩和冲(钻)孔灌注桩两种桩基在溶、土洞地质条件下的工程施工技术;岩溶、土洞和软土层的加固处理方法。 In this article, authors simply introduce some techniques and construction method, including the static pressure pipe pile foundation, the punched and drilled grouting pile foundation, and the strengthening and treatment method for solution cavities, soil cavities and soft soil strata, adopted under the geologic condition of solution cavity and soil cavity, in the rock and soil project of the freight station area of Guangzhou New Baiyun International Airport.
出处 《施工技术》 CAS 北大核心 2003年第1期10-12,共3页 Construction Technology
关键词 桩基施工 基础工程 静压管桩 冲(钻)孔灌注桩 岩溶 土洞 软弱土层 foundation engineering static pressure pipe pile punched and drilled grouting pile solution cavity soil cavity soft soil stratum
  • 相关文献

同被引文献22

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部