摘要
在佳木斯越江盾构隧道始发井施工中,采用井内排水下沉法和不排水下沉法的施工技术,解决了饱和水砂砾石层中带十字梁的沉井的施工技术难题,取得了较好的效果。
In construction of the starting well of the shield tunnel cross Songhuajiang river in Jiamusi city, engineers adopted the drainageinwell sinking method and the undrainage sinking method to solve construction technical problems of open caisson with crossbeam in sandgravel stratum. These method got good effect.
出处
《施工技术》
CAS
北大核心
2003年第1期50-51,46,共3页
Construction Technology