期刊文献+

东黄复线输油泵运行的合理匹配 被引量:3

Reasonable Matching for Pump Operation in Dongying - Huangdao Parallel Oil Pipeline
下载PDF
导出
摘要 东黄复线受进口原油数量和原油抵岸日期的限制,日、旬、月输油计划变化较大,导致黄岛首站5台输油泵与管道运行计划不匹配。根据这种状况,对黄岛油库外输泵实施科学匹配,对泵匹配前后的运行参数及经济效益进行了对比。采用优化运行方案后可以达到节能降耗的目的。 The scheme in oil transportation in Dongying-Huangdao Parallel Oil Pipeline varies in daily,decade and month due to the limitation of imported unloaded oil and oil landed date,which results in the mismatch between the 5 pumps in Huangdao Initial Station and operation scheme of the pipeline. Therefore,a scientific rematching for the pumps in Huangdao tank farm is made. An economical comparison on the operational parameters of the pumps before and after matching is done. The energy saving target can be reached after the new optimal operation scheme is put into use.
出处 《油气储运》 CAS 北大核心 2002年第12期48-50,共3页 Oil & Gas Storage and Transportation
关键词 东黄复线 输油管道 输油泵 匹配 优化运行 节能降耗 oil pipeline,pump ,reasonable match,optimal operation ,energy saving
  • 相关文献

同被引文献57

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部