摘要
针对吉林油田目前机械堵水施工操作不便 ,堵水有效期短等现状 ,设计了一种新型封隔器Y2 41-114。该封隔器具有现场施工操作简便 ,封堵有效期长 ,强收卡瓦锚定等特点。经现场应用 ,施工成功率达 10 0 % ,封堵有效期明显增长。
According to the present status of mechanical water shutoff in Jilin oilfield,that is the short valid period and inconvenient operation,a new Y241-114 packer is developed.The packer has many advantages,such as long plugging valid period,simple field construction and slip anchoring etc..Through field application,the success ratio of the packer is high up to 100% and valid period of plugging is obviously improved.
出处
《钻采工艺》
CAS
2003年第1期50-51,67,共3页
Drilling & Production Technology