摘要
对镍闪速熔炼系统投产以来闪速炉余热锅炉的运行情况和影响余热锅炉出口温度的因素进行了分析 。
The running status of the waste heat boiler in Jinchuan nickel flash smelting furnace and the effecting factors on the outlet gas temperature of the waste heat boiler are discussed in detail, and the resolving methods are also put forward.
出处
《有色金属(冶炼部分)》
CAS
2003年第1期29-30,共2页
Nonferrous Metals(Extractive Metallurgy)