采用土钉墙支护的深基坑险情原因及加固施工 被引量:6

CAUSE OF CRACKS IN SOIL-NAILED RETAINING WALL IN DEEP FOUNDATION PIT AND STRENGTHENING THEREOF
下载PDF
导出
摘要 某电厂基坑开挖深度9.5m,采用土钉墙作为支护结构,施工中曾出现水平和斜裂缝。分析裂缝原因后对基坑进行加固,采取加长土钉长度并加大角度以提高摩阻力、设置超前桩以保证支护体系安全稳定、降低地下水位以减轻坑壁侧压力等措施,使基坑位移增量明显减小,累计位移增量小于10mm,保证了施工安全。 Soil nailed retaining wall was adopted as shoring struc-ture for9.5m depth excavation works of a power plant construction.Horizontal and inclined cracks once appeared in the wall.After analy-sis on the cause thereof,variety of technical measures was adopted to strengthen the wall.Super-long soil nails with greater slope were used to increase friction;Advanced piling was adopted to secure safety and stability of the shoring system;Dewatering was made to reduce lateral thrust by underwater.Monitoring indicated the lateral displacement of the retain ing wall was reduced and the cumulative displacement was less than10mm and thus safety secured.
作者 郑坚
出处 《建筑技术》 北大核心 2003年第2期115-117,共3页 Architecture Technology
关键词 土钉墙 支护 深基坑 原因 加固 施工 deep foundation pit soil nailing retaining strengthen-ing stability
  • 相关文献

同被引文献41

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部