期刊文献+

基于多代理的炼钢-连铸生产调度方法

<etitle>A Mulri-agent-based Scheduling Approach for Steelmaking-Continuous Casting production
下载PDF
导出
摘要 多代理机制的分布式结构和实时处理能力为炼钢-连铸生产动态调度系统的实现提供了可行的技术方法。本文通过对炼钢-连铸生产调度问题的简单分析,提出炼钢-连铸生产调度的多代理体系框架、各个代理的功能及主要代理的详细设计,探讨了基于多代理的炼钢-连铸生产调度机制,并给出了一个简单的炼钢。连铸生产调度的实例分析结果。
出处 《计算机系统应用》 北大核心 2002年第10期54-57,共4页 Computer Systems & Applications
  • 相关文献

参考文献5

  • 1R.J.Rabelo, L.M.Camarinha-Matos, H.Afsarmanesh. Multi-agent-based agile scheduling [J]. Robotics and Autonomous Systems, 1999, 27:15~28.
  • 2Lixin Tang, Jiyin Liu, Aiying Rong, Zihou Yang.A review of planning and scheduling systems and methods for integrated steel production [J]. European Journal of Operational Research, 2001, 133:1~20.
  • 3L.Overgaard, H.G.Petersen, J.W.Perram. Reactive motion planning: a multi-agent approach [J].Applied AI, 1996, 10(1): 35~52.
  • 4Jir í Lazansky, Olga ? t (e) p á nkov á, Vladim í r Mar í k, Michal P (e) choucek. Application of the multi-agent approach in production planning and modeling [J]. Engineering Applications of Artificial Intelligence, 2001, 14: 369~376.
  • 5F.Maturana, W.Shen, D.H.Norrie. MetaMorph:an adaptive agent-based architecture for intelligent manufacturing [J]. International Journal of Production Research, 1999, 37(10): 2159~2173.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部