摘要
介绍新临钢板坯连铸机断面改造工程连铸机水冷系统改造设计的过程。实践证明新的二冷系统是合理的、成功的。
This paper introduces the essential process of the reforming design for secondary cooling system in slab CC at New Lingang. After being used for a period, the new secondary cooling system has been proved to be reasonal and successful.
出处
《连铸》
2003年第1期16-17,11,共3页
Continuous Casting