摘要 用瞬变电磁测深 (TEM )和大地电磁测深 (MT)两种方法测量了三峡直流输电工程中接地极址的地下电性分布 ,将TEM资料通过时频转换 ,转换成频率域的视电阻率曲线 ,它与MT的视电阻率曲线对接后 ,再经过反演可以得到极址下方由浅层到深层的电阻率断面图 。 The ground electrical distribution of earthed pole in direct current power transmission of Three Gorges Project is measured by using transient electromagnetic method (TEM) and magnetotelluric method (MT). Data from TEM are converted into apparent resistivity curves of frequency domain by using time-frequency transmission, after it is jointed end by end with the apparent resistivity from MT, a resistivity profile below the earthed pole is obtained by inversion, by which reliable and necessary references are provided for designing and building the earthed pole.
出处 《江汉石油学院学报》 CSCD 北大核心 2002年第4期107-109,共3页 Journal of Jianghan Petroleum Institute
基金 CNPC物探重点实验室项目 (2 0 0 1J1 0 3)
关键词 电磁方法 三峡输电工程 应用 瞬变电磁法 大地电磁勘探 视电阻率 电特性 极址 三峡工程 transient electromagnetic method magnetotelluric method apparent resistivity electric feature pole Three Gorges Project
  • 相关文献

同被引文献43

引证文献3

二级引证文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部