期刊文献+

风成沙污染水处理系统去除BOD_5的效果评价 被引量:4

AN EVALUATION OF THE EFFECT OF ANEMOARENYTE TREATMENT SYSTEM TO REMOVE BOD5
下载PDF
导出
摘要 利用风成沙净化污染水试验,结果表明,在水力负荷为1.0m d、湿干周期比为12h∶12h或48h∶48h条件下,风成沙处理污染水系统对BOD5处理效果较好,出水ρ(BOD5)≤2mg L,优于《地表水环境质量标准(GHZB1-1999)》Ⅰ类标准。影响处理效果的因素主要有湿干周期比、水力负荷和接种驯化方式等。 The experiment results shows, using anemoarenyte as filter media, on the condition that hydraulic loading rate was 1.0 m/d, and flooding-drying ratio was 12h∶12h or 48h∶48h, the anemoarenyte system can remove BOD5 efficiently. The concentration of BOD5 in the effluent is less than 2 mg/l, which is surpassed to the class I of environmental quality standard of BOD5in water (GHZB 1-1999). The performance of the process is affected by the ratio of humid-dry, hydraulic loading rate, filter depth and the method of microbes, etc.
出处 《吉林大学学报(地球科学版)》 EI CAS CSCD 北大核心 2003年第1期80-82,共3页 Journal of Jilin University:Earth Science Edition
基金 国家重点基础研究项目(G1999045708) 科技部公益性研究项目资助(2001-161)
关键词 风成沙污染水处理系统 官厅水库 BOD5 需氧有机物 湿干周期比 水力负荷 滤层 anemoarenyte system guanting reservoir, BOD_5
  • 相关文献

参考文献1

  • 1国家环境保护总局(China Environmental Protection Agency).GHZB 1-1999地表水环境质量标准[S](GHZB 11999 Environmental quality standard for surface water[S])[M].北京:中国标准出版社(Beijing: China Standard Press),2000.146-148.

同被引文献57

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部