期刊文献+

汽车综合性能检测线的建模与短期调度 被引量:2

Modeling and short-term scheduling of synthetic vehicle performance test line
下载PDF
导出
摘要 研究了汽车综合性能检测线批次检测车辆的建模与短期调度问题 .调度的目标是使给定数量车辆检测时间最短 .该过程是一个变存储策略的序贯多目的批处理过程 .建立调度数学模型时 ,把Moon等人[1] 的工作推广到了NW ,NIS ,FIS存储策略 ,并根据汽车综合性能检测线的实际情况建立了顺序相关存储策略和人力资源约束的数学表达 .该数学模型表达为一个混合整数非线性规划 (MINLP) ,经线性化处理转化为一个混合整数线性规划问题 (MILP) ,求解使用了分枝定界法 (BAB) .计算结果对汽车综合性能检测线批次车辆检测排序和驾驶员人数安排有指导性作用 ,提高了车辆检测效率 . The modeling and short_term scheduling of synthetic vehicle performance test line are presented. The purpose of scheduling is to minimize the test time of the given number of vehicles. The process of vehicle test is a sequential multipurpose batch process with variant storage policy. When the mathematic scheduling model is built, the result of Moon and Hrymak is extended to the NW, NIS, FIS storage policies. Then the sequence_dependent storage policy as well as constraint of manpower is formulated as inequalities based on the situation of the test line. The scheduling model is formulated as a mixed integer nonlinear programming (MINLP) problem, and converted to a mixed integer linear programming (MILP) problem by linearization. The branch and bound (BAB) technique is used when the MILP problem is solved. The optimal scheduling has instructive significance for sequencing vehicles, deciding the number of drivers, and improving test efficiency when the given number of vehicles are tested.
出处 《控制理论与应用》 EI CAS CSCD 北大核心 2002年第5期681-688,共8页 Control Theory & Applications
关键词 汽车综合性能检测线 建模 短期调度 存储策略 混合整数线性规划 数学模型 short_term scheduling multipurpose batch plant storage policy MILP synthetic vehicle performance test line
  • 相关文献

参考文献10

  • 1Moon S, Hrymak A N. Mixed-integer linear programming model for short-term scheduling of a special class of multipurpose batch plants[J]. Ind. Eng. Chem. Res., 1999,38:2144-2150
  • 2Kondili E, Pantelides C C, Sargent R W H. A general algorithm for scheduling forbatch operation- Ⅰ [J]. Computers & Chemical Engineering, 1993,17:211 - 227
  • 3Shah N, Pantelides C C, Sargent R W H. A general algorithm for scheduling for batch operation- Ⅱ [J]. Computers & Chemical Engineering, 1993,17:229-244
  • 4ShahN. Single and multisite planning and scheduling : current status and future challenges [ A ]. In Pekney J, Blau G. Foundations of Computer Aided Process Operations [M]. USA: American Institute of Chemical Engineers Symposium Series 320, 1998,94:75-90
  • 5Schiling G, Pantelide C C. A simplified continuous-time process scheduling formulation and a novel solution algorithm [ J]. Computers & Chemical Engineering, 1996,20:1221 - 1226
  • 6Ierapetritou M G, Floudas C A. Effective continuous-time for shortterm scheduling-1: Multipurpose batch processes [ J ]. Ind. Eng.Chem. Rea., 1998,37:4341-4359
  • 7Ierapetritou M G, Floudas C A. Effective continuous-time for shortterm scheduling-2: Continuous and semicontinuous processes [J].Ind. Eng. Chem. Res., 1998,37:4360-4374
  • 8Ierapetritou M G, Floudas C A. Effective continuous-time for shortterm scheduling-3: Multiple intermediate due dates [ J]. Ind. Eng.Chem. Res. ,1999,38: ,3446- 3461
  • 9Pinto J M , Grossman I E. A continuous time mixed linear programming for short term scheduling of multistage batch plant [J]. Ind.Eng. Chem. Res., 1995,34:,3037-3051
  • 10Pinto J M,Grossman I E. A continuous-time MILP model for short term scheduling of multistage batch plant with pre-ordering constraints [J]. Computers & Chemical Engineering, 1996,20:1197-1202

同被引文献23

  • 1陈静,陈红梅,高寒.基于Petri网的Tapestry系统性能评价[J].舰船电子工程,2008,28(12):118-120. 被引量:1
  • 2刘昭度,姚圣卓,王国业,何玮.在用车工况法排放检测用重型底盘测功机滚筒技术规格研究[J].汽车工程,2007,29(1):79-82. 被引量:3
  • 3LI Zhiwu, ZHOU Mengchu, W. Naiqi. A Survey and Compar- ison of Petri net Based Deadlock prevention policies for flexible manufacturing systems[J]. IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews, 2008,38(2) : 173-188.
  • 4GU Tianlong, P. A. Bahri. A survey of petri net applications in batch processes[J]. Computers in Industry, 2002,47 (2) : 99- 111.
  • 5GU Tianlong, P. A. Bahri, C. Guoyong. Timed Petri Net based formulation and analgorithm for the optimal scheduling of batch plants[J]. Journal of Application Mathematic and Computer Science, 2003,13 (4) : 527-536.
  • 6千承辉.基于嵌入式实时系统的汽车检测线控制系统研究[D].长春:吉林大学,2008.
  • 7千承辉.基于嵌入式实时系统的汽车检测线控制系统研究[D].长春:吉林大学,2008.
  • 8LI Z W, ZHOU M, WU N Q. A survey and comparison of Petri net based deadlock prevention policies for flexible manu- facturing systems[J]. IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews, 2008,38 (2):173-188.
  • 9GUT L, BAHRI P A. A survey of petri net applications in batch processes [J]. computers in industry, 2002, 47 (2) : 99-111.
  • 10GUT L, BAHR P A. Timed Petri net based formulation and analgorithm for the optimal scheduling of batch plants[J]. Journal of Application Mathematic and Computer Science, 2003,13 (4) : 527-536.

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部