摘要
本文把矿井水平垂高的合理确定问题溶于矿井动态系统的综合最优化之中,用动态规划方法求解出最优方案,在局部问题优化和整体优化的结合上做一探讨.
This article combines the rational determination of vertical height of level interval with the optimization of mine dynamic system. The optinal plan is obtained by means of dynamic programe. The article also discusses the combination of partial optimization and overall optinization.
关键词
矿井
设计
水平垂高
动态系统
vertical hight of level interval
mining dynamic system
step
attitude
decision
index function