期刊文献+

沁水煤层气山地地震采集技术管理

TECHNICAL MANAGEMENT OF MOUNTAIN SEISMIC DATA COLLECTION FOR PROSPECTION FOR QINGSHUI COAL BED GAS IN SHANXI
下载PDF
导出
摘要 沁水煤层气山地地震采集是我们在经过多年山地采集经验的基础上完成的。施工按国际标准化的管理模式进行项目管理,从招标、投标、施工作业组织管理、技术质量管理要求到作业过程的质量控制、工程量和质量的认定,包括山地采集的基本方法(激电井深、药量的选择,测量方法,仪器及其参数的选择)及采集质量与现场技术管理及技术质量监督等方面,采用了适合中国国情与国际标准有机结合的方法。体现了在复杂的山区实施地震采集项目采用先进地震采集技术管理的特色。 It is on the basis of the experience in long years of our mountain seismic data collection that the mountain seismic data collection was finished successfully for the prospection for Qingshui coal bed gas in Shanxi. The construction was carried out strictly in an international standardized management mode. Concretely speaking, the international practice of quality management was combined properly with our practice when we dealt with such all aspects concerning the construction as bids-inviting or submitting, organization management of construction, technical quality management, quality control of construction, quality and quantity checkage of engineering projects, technology and methods of mountain seismic data collection (including depth of induced hole, amount of explosive, testing ways, and kinds and parameters of testing instruments). Also, it is our characteristics of technical management in seismic data collection in changefully mountainous regions.
作者 郭浩
出处 《化工矿产地质》 CAS 2002年第3期169-174,共6页 Geology of Chemical Minerals
关键词 煤层气 地震采集 质量管理 质量控制 招标 投标 seismic data collection, quality management, mountain seism
  • 相关文献

参考文献1

  • 1李庆忠.走向精确勘探的道路[M].北京:石油工业出版社,1993.161.

共引文献147

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部