摘要
结合温岭石塘渔港二期防波堤工程,探讨防波堤的轴线布置方案与断面结构方案,重点研究了桩基档板透空式防波堤这一较新型结构,该防波堤具有结构简单、施工方便、对潮流影响小的优点,发展前景广阔。
In combination with Wenling Municipal Shitang Fishing Port Phase II Breakwater Project, this paper discussed breakwater axial layout scheme and sectional structure scheme, and studied the new structure of open-type breakwater of piled foundation and baffle plate, which is characterized by simple structure, convenient construction and slight influence to tidal current and which has a broad development prospect
出处
《水运工程》
北大核心
2003年第2期18-20,共3页
Port & Waterway Engineering