摘要
在300m^3高炉做了矿焦混装试验。含铁炉料由烧结矿和球团组成,试验取得良好效果,高炉顺行,产量提高了6.68%,焦比降低4.1%。
Mixed charging of ore and coke has been carried out at 300 m^3 blast furnace. The ferric burden consists of sinter and pellets. The blast furnace operation is stable. Production is increased by 6.68 % and coke rate is decreased by 4.1%.
出处
《钢铁》
CAS
CSCD
北大核心
1992年第5期14-16,13,共4页
Iron and Steel