摘要
在介绍分支井完井TAML分级情况及完井设计原则的基础上,详细介绍了塑性水泥固井技术在两口分支水平井中的应用情况,以梁46-支平1井为例,分析了分支井完井应注意的问题,对进一步推广应用分支井技术及提高分支井固井质量具有重要意义。
Based on the stage completions and principles of the completion designs of lateral wells , the plastic cementing techniques in two lateral horizontal wells are introduced in detail. Taking Liang 46Zhiping 1 Well as example, the problems needed to be taken care are analyzed, which is meaningful to expand the applications of lateral well techniques and to improve completion quality.
出处
《石油钻探技术》
CAS
2003年第1期4-6,共3页
Petroleum Drilling Techniques
基金
863青年基金项目"具有'三性'特征的分支井井下分支系统研究"(编号2001AA616130)部分内容
关键词
分支井
水平井
完井
塑性水泥
胜利油田
桩1-支平1井
梁46-支平1井
设计
lateral well
horizontal well
well completion
plastic cement
Zhuan 1-Zhiping 1 Well
Liang 46-Zhiping 1 Well
Shengli Oilfield