摘要
在转炉扩容至80吨的条件下,对枪位及造渣等工艺进行了试验研究。确定了最佳枪位,前期为1. 6m,中期为1. 7m。并建议相应扩大氧枪,缩短吹炼时间。
Experimental tests were conducted on the lance position and slagging practice with the volume capacity of the converter of the Plant being expanded to 80-tonne/heat. The optimum lance position is finalized to be 1.6m for the initial stage and 1.7m for the intermediate stage, extension of oxygen-lance and reduction of blowing time are also recommended.
出处
《钢铁研究》
CAS
1992年第3期8-12,共5页
Research on Iron and Steel
关键词
转炉
复吹
扩容
枪位
造渣
converter combine blowing volume enlargement lance position slagging