年度/季度施工计划的生成和调整

The Generation and Adjusting of Annual/Seasonal Plan
下载PDF
导出
摘要 文章针对大型工程建设管理,提出了基于网络计划的由计算机实现的进度和投资控制管理模型,它以工程设计产生的网络计划为基准,并根据具体施工情况综合分析,得到每一施工年度各个施工单位的工程量和投资,从而生成年度季度施工计划,通过年度工程量和投资计划,严格控制工程的进度和投资,保证工程质量和工程工期,并实现投资最优。 In view of the complication, and importance of the large engineering construction management, the paper presented a new management model of process and investment based on network plan by computer. According to engineering design and synthetical analysis of the special construction situation, the model strictly controls the process and the investment to guarantee both engineering quality and scheduled time so as to optimize the investment through annual engineering amount and investment of every construction unit and producing annual/season construction plan.
出处 《企业技术开发(下半月)》 2003年第1期7-9,共3页
关键词 年度/季度施工计划 生成 工程建设 网络计划 施工管理 engineering construction network plan construction management process invest annual plan
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部