水利水电施工搭接网络进度风险计算 被引量:16

Risk calculation of precedence network schedule for hydraulic projects
下载PDF
导出
摘要 搭接进度网络可替代双代号和单代号进度网络而得到广泛应用 ,但PERT方法并不适用于搭接进度网络 ,因此搭接进度网络风险计算有待探讨。本文将搭接进度网络相邻两工序的时距假设为工序 ,并称其为时距工序 ,然后使其转化为广义PERT网络。在此基础上 ,首先提出了用MC (MonteCarlo)方法计算施工搭接网络进度风险的步骤和方法。其次针对MC (MonteCarlo)方法和经典PERT计算进度风险的不足 ,提出了修正PERT计算施工搭接网络进度风险的方法。将MC方法和修正PERT方法应用于工程实例 。 The Precedence Network(PN) can substitute the Activity on Arrow Network and the Activity on Node Network.Because PERT is not suitable for PN,so the schedule risk calculation of PN is to be discussed.In this article,the lag between two adjacent working procedures in PN was hypothesized as the Working Procedure,named as Lag Procedure.Then,PN can be transformed into the general PERT.On this basis,the steps and method of calculating schedule risk of PN by MC(Monte Carlo) method was put forward.The modified method PERT in calculation schedule risk of PN was put forward.Satisfactory results will be obtained when the MC method and the modified PERT method are put into practice.
出处 《水利学报》 EI CSCD 北大核心 2003年第1期98-102,108,共6页 Journal of Hydraulic Engineering
关键词 水利水电施工 搭接网络 风险 计算 施工进度 工序 precedence network construction schedule risk procedure
  • 相关文献

参考文献3

二级参考文献11

  • 1王成斌.经典PERT时间模型的某些局限性及改进途径[J].系统工程理论与实践,1991,11(2):7-13.
  • 2杨建国,航空科学基金论文集.6,1995年
  • 3团体著者,中国网络计划技术大全,1993年
  • 4团体著者,工程项目管理手册,1992年
  • 5阮镰,工程系统的规划与设计,1991年
  • 6冯允成,活动网络分析,1991年
  • 7白思俊,网络计划的计算机辅助分析,1991年
  • 8王成斌,系统工程理论与实践,1991年,11卷,2期,7页
  • 9刘士贤,建设项目进度控制,1994年,72页
  • 10李庆华,中国网络计划技术大全,1993年,807页

共引文献94

同被引文献101

引证文献16

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部