摘要
对软土中两根47 m长灌注桩分别在成桩28 d和1 750 d后进行了承载力试验,其极限承载力提高幅度达到30%左右。分析了单桩承载力随时间提高(称为时效)的机理,提出了单桩承载力时效对桩筏基础桩土相互作用影响的分析方法,并结合工程实例进行了分析。
Pile loading tests of two bored piles of length 47m in soft soil are carried out for 28 days and 1 750 days after they are constructed. In-situ test shows that the ultimate bearing capacity of these two single piles increased about 30 %. The mechanism of time-effect of bearing capacity of pile is analyzed; and method of analyzing the effects of the time-effect of a pile抯 bearing capacity on pile-soil interaction of pile-raft foundation is discussed with an engineering example.
出处
《岩土力学》
EI
CAS
CSCD
北大核心
2003年第1期65-69,74,共6页
Rock and Soil Mechanics
关键词
单桩承载力
桩筏基础
桩土相互作用
沉降
产生机理
bearing capacity of single pile
pile-raft foundation
pile-soil interaction
settlement