期刊文献+

巴基斯坦卡拉奇港桩工记事 被引量:1

Piling Work in Karachi Port.Pakistan
下载PDF
导出
摘要 本文记述了在巴基斯坦卡拉奇港五号油码头的桩工,包括打桩和拉桩试验的情况。这是我们第一次在南亚打桩;也是第一次在海上做斜桩的拉桩试验;还是第一次在按照德国规范实施条件下打桩和试桩。与我们多年建港中的做法及经验有些不同,本文提出了桩工方面的几个问题并予以讨论。 Pihng work for Oil Pier V in Karachi Port,Pakistan,including pile-driving and pull-out tests,is described in the pa- per.It was the first time for First Navigational Engineering Bureau(FNEB)to carry out piling work in South Asia and to carry out piling work and pull-out tests in line with German standards and codes of practice,and also the first time for FNEB to carry out pull-out tests for raking piles on the sea.The practice and experience gained in the piling work at Oil Pier V is to some extent different from that acquired for many years in port construction works executed by FNEB. Some problems in the piling work and discussions thereof are presented in the paper.
作者 柴长清
出处 《港口工程》 1992年第5期1-13,共13页
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部