期刊文献+

MRP—Ⅱ在外购件供应上的具体应用

Actual application of MRP-Ⅱ on parts purchase
下载PDF
导出
摘要 随着市场竞争的日益激烈,压缩库存资金,加快流动资金的周转和搞好缺件配套对于多品种、小批量生产的机械制造厂是尤为重要的。本文以济南第二机床厂为背景,着重于供运处外购件的配套,采用MRPⅡ的原理对库存、采购计划、合同实行计算机辅助控制,取得了良好的效果。 It is critical for a machinery manufacturer with many kinds and small batch of products to reduce its inventory, to speed up circulation of its working capital and to keep in-time sub-contracted and matching parts for its products with the ever-increasing competition in the market.This article takes Jinan No.2 Machine-Tool Works as an example and mainly covers how its supply and transportation Division does well with its purchasing of sub-contracted and matching parts for its products in accordance with MRPⅡ principle and with the aid of computers to control its inventor, purchasing plans and contracts with good results.
机构地区 济南第二机床厂
出处 《成组技术与生产现代化》 1995年第1期38-42,33,共5页 Group Technology & Production Modernization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部