摘要
本文对在极其破碎的矿岩条件下担负着全矿 12 5万t/a出矿任务的采场溜矿井从设计、施工及管理等方面进行了研究与探讨 。
Under the complex condition of badly broken rocks, the design, construction and management of ore chute which takes on ore production of 1250000t/a, are studied and discussed, and some opinions about it are presented.
出处
《有色矿山》
2001年第6期12-15,共4页
Nonferrous Mines