李家峡水电站双排布置的水轮发电机组的运行分析 被引量:2

Operation analysis of the two-row generating units of Lijiaxia Hydropower Station
下载PDF
导出
摘要 通过机组双排布置的模型试验、现场运行的稳定性试验以及现场实际运行监测的结果 ,对李家峡水电站双排布置的水轮发电机组的运行情况进行了总结。双排机组联合运行时 ,不同的负荷对机组间的性能影响是很大的 ,改善了上游排机组尾水管的水力特性 ,但对下游排机组尾水管的压力脉动影响较大。负荷的调配应遵循机组双排布置的特性 。 On the basis of the results from the model tests on the two row arrangement of generating unit, the stability tests on the field operation and the actual operation observations, this paper sums up the operation of the two row hydro generating units of the Lijiaxia Hydropower Station. When the combined operation of the two row generating units is made, the effect of different loads on the performances between generating units is big. When the hydraulic characteristics of the draft tube of upstream row generating units are improved, the effect on the pressure pulse of the draft tube of downstream row generating units is big. Therefore the features of two row arrangement of generating units should be obeyed and rational load allocation between generating units should be conducted.
出处 《水力发电》 北大核心 2003年第2期57-60,68,共5页 Water Power
关键词 李家峡水电站 双排布置 水轮发电机组 运行 测试 负荷 尾水管 two row arrangement of generating units, tests, operation analysis, Lijiaxia Hydropower Station
  • 相关文献

参考文献3

共引文献4

同被引文献24

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部