摘要
介绍了太铁中心医院直线加速器机房的施工过程,为解决好防辐射大体积混凝土的施工,介绍了所采取的科学有效的施工方法及措施,使防辐射大体积混凝土的施工质量各项指标达到了设计要求。
The integral construction process of the linear accelerator machine house is presented. To solve problems found in the construction of radiation-resistant large volume concrete, the scientific and efficient construction methods and measures are introduced to make the construction quality of radiation-resistant large volume concrete reach the design demands.
出处
《山西建筑》
2003年第2期73-74,共2页
Shanxi Architecture
关键词
防辐射
大体积混凝土
机房
模板工程
钢筋工程
radiation-resistant large volume concrete, construction, linear accelerator machine house