摘要
征地拆迁工作是影响工程建设施工工期的重要因素,对工程建设的顺利进行有巨大的影响。结合侯运路征地拆迁工作的经验,就征地拆迁中必须做好的六项工作提出了有借鉴意义的做法。
The land levying and old house removal work is an important work that affects construction time limit. And it has great effect on engineering construction successful finish, ombined with experiences of land levying and old house removal in Houyun express highway construction, some reference methods are given for six project work that should be done better in land levying and old house removal work.
出处
《山西建筑》
2003年第2期135-136,共2页
Shanxi Architecture
关键词
征地拆迁
施工工期
环境营造
质量管理
land levying and old house removal, construction time limit, environment building, quality management