摘要
介绍华蓥山发电厂#2锅炉炉墙及主汽管采用新型保温材料的改造方案,并进行热力校核计算。通过改造后的运行实践证明,效果令人满意。
The paper introduces the refoming plan that a new heat-insulating materals is used on the furnance wall and the main steam piping of 2# boiler in Hua YingShan power plant,and engages in thermodynamic check caculate to the plan.After reforming operation indicates the efforts is very good.
出处
《重庆电力高等专科学校学报》
2002年第3期6-10,64,共6页
Journal of Chongqing Electric Power College